Upcoming road closures, traffic alerts for June 17-23

PADUCAH, KY — Here are the upcoming traffic and construction alerts plus road closures for the Local 6 area for the week of June 17 through June 23:

IL 169

IL 169 – Pulaski and Massac Counties, Illinois

Shoulder work will begin on IL 169 on both the east and westbound lanes on 7 a.m. Monday, June 17, weather permitting.

Work will take place between IL 37 and US 45. Traffic will be reduced to one lane during the construction period.

I-57

I-57 South – Alexander County, Illinois

The Illinois Department of Transportation (IDOT) said in a news release the southbound on-ramp at M.P. 1 will be closed for three weeks starting at 7 a.m. Monday, June 17.

 

This ramp provides access onto I-57 South. The ramp will be undergoing pavement replacement.

IDOT said drivers utilizing Route 3 near Cairo will be affected.

A detour will be marked. Drivers will be able to take IL 37 near Mounds to access I-57 South.

KY 58/West 12th Street

KY 58/West 12th Street – Benton, Kentucky 

KY 58/West 12th Street will be reduced to one lane for water line repairs in Benton on Monday, June 17.

The reduction is projected to last for two to four hours, weather permitting.

Alternating flow of traffic will be controlled by flaggers.

Route BB – Scott County, Missouri

Weather permitting, Route BB in Scott County will be closed from 8 a.m. to 3 p.m. Tuesday, June 18 for a culvert pipe replacement.

The Missouri Department of Transportation (MoDOT) said in a news release the closure is between Route 114 and Wakefield Street.

The work zone will be marked with signs for drivers in the area.

US 60

US 60 – Paducah, Kentucky

Starting Tuesday night, June 18, the Kentucky Transportation Cabinet (KYTC) will be shifting traffic to the outside lanes along the US 60 work zone near Kentucky Oaks Mall in Paducah.

Weather permitting, the work will ideally be completed by Thursday night, June 20, at the latest.

The shift will occur between Coleman Road and New Holt Road so crews can work along the median area.

The work zone along US 60 extends from Holt Road at milepoint 10.130 running eastward to near the Coleman Road Intersection at milepoint 10.981. It goes through the mall area and through the I-24 Paducah Exit 4 Interchange. The I-24 Interchange will be closing in July so the final connecting points of the intersection can be constructed.

Left turns will remain restricted to signalized intersections, KYTC said.

The lane shift is part of an on-going project to restructure the I-24 interchange along US 60.

Marion, Illinois has a similar double diamond interchange to what I-24 will become. Click here to see what that looked like.

Route P – New Madrid County, Missouri

Route P will be reduced with an 11-foot wide restriction starting Thursday, June 20 for bridge replacements.

This bridge is over I-55 in Sikeston.

Weather permitting, crews hope to work starting June 20 from 6 a.m. to 8 p.m. daily until Saturday, July 13.

The work zone will be marked with signs.


For more information on the Illinois closures, visit GettingAroundIllinois.com or follow IDOT District 9 on Twitter.

For more information on the Kentucky closures, visit the KYTC Highway District 1 Facebook page.

For more information on the Missouri closures, visit MoDOT’s Facebook page, Twitter page, their website or call their Customer Service Center at 1-888-275-6636.